Article
Contents · 8 sections
The cold kiln
The kiln beside Unit 1 at Bhuvan Vitrified has been cold since 2019, and Ishaan Bakshi is photographing its chimney. Reena Solanki, who runs finance for the company, waits with her hands in her pockets. Behind the chimney lie fourteen acres of scrub and a boundary wall: the family's first factory, closed when production moved to Unit 2 on the highway out of Morbi. The land earns nothing and appears in no one's EBITDA.
Ishaan leads the deal for Ardhan Building Products, which wants to buy Bhuvan from its founder, Chirag Faldu. Everything else he needs is in a folder in Reena's office: a loan from Chirag to his own company, an instalment still owed to the man who sold Bhuvan a glaze line, a demand notice from the tax department that the company is appealing, and an engineer's report saying the second kiln's refractory lining (the heat-proof brick shell) is a year past its maker's date.
Ardhan's offer is an enterprise value of ₹453 crore, which is 7.5 times the ₹60.4 crore of EBITDA (earnings before interest, tax, depreciation and amortisation) in Bhuvan's management accounts. That figure includes ₹2.4 crore of interest and fund gains. Chirag has told his family to expect about ₹411 crore for the shares: the ₹453 crore, less the bank's ₹118 crore, plus every rupee in the bank and the funds, plus the land at ₹30 crore. Once Ishaan's team has worked through the folder, it will arrive at about ₹279 crore. Each figure follows from its own list of what counts, and the whole of this article is about the ₹132 crore between the two lists.
The kilns, the land and the people walking past them are drawn for this page. The 7.5 times is the story's own multiple and says nothing about what tile makers sell for.
Two prices for one factory
Enterprise value is what the operating business is worth to everyone who has put money into it: the lenders, the owners and anyone else with a fixed claim. Equity value is what is left for the owners after those other claims are met. The step between them is called the bridge, and the amount that comes off is net debt: borrowings, less the cash that is genuinely spare. A buyer who offers on a "cash-free, debt-free" basis is offering the enterprise value and promising to settle the rest at the bridge.
Net debt has no fixed content; every deal defines it. Here it means borrowings plus debt-like items less surplus cash, and the article says what it includes each time. A debt-like item is an obligation that will be settled in cash, is not part of the running costs already inside EBITDA, and is not in the borrowings figure: money owed for something already bought, a pension or gratuity promise, a tax bill. A surplus asset is something the company owns that its operating profit does not use, such as idle land. The International Valuation Standards make the same point: a business valued on a multiple of EBITDA captures only the assets used to produce that EBITDA, and the example they give is an idle plant whose value has to be found separately (IVS 200, paragraph 120.02, in the edition effective 31 January 2025).
A simple bridge, borrowings off and surplus cash on, is enough for a company whose only claim is the bank's. Bhuvan has ten lines that someone will argue about.
One question for every line
Each line is placed by three questions. Is it already inside the earnings being multiplied, as a cost or as income? If so, adding or deducting it again counts it twice. Is it a claim that will be paid in cash from the company, over and above what the operations produce? If so, it comes off. Can it be separated from the operations and realised without disturbing them? If so, it goes on. Applied to Bhuvan, the questions give one defensible reading, and the amounts are assumptions explained in the notes.
| Line and amount (₹ crore) | Deciding question, and the reading |
|---|---|
| Bank borrowings, 118.0 | Claim. Owed to lenders and repaid from company cash. Deduct in full. |
| Cash and bank, 14.0 | Separable only in part. ₹6.0 crore keeps the plant running and stays with the business as part of its normal working capital; ₹4.0 crore is margin money (cash held with the bank as security for guarantees). Only 4.0 is free. |
| Liquid investments, 32.0 | In the earnings: they earn ₹2.4 crore a year, which management has put inside EBITDA. Take the income out of EBITDA and add the 32.0. |
| Lease commitments, 26.1 | In the earnings. Assume Bhuvan reports under the older Indian standards, as a smaller unlisted company may, so its rent of ₹6.0 crore is already charged above EBITDA. This is the present value of that rent; nothing to deduct. |
| Promoter loan, 15.0 | Claim. Repaid from company cash at completion. Deduct 15.0; Chirag gets it back. |
| Deferred consideration, 8.0 | Claim. A fixed sum owed for a glaze line already bought, half after one year and half after two. At 10% its present value is 6.9. |
| Unfunded gratuity, 5.6 | Claim. Actuarial liability 9.2 against fund assets of 3.6. The tax saved when it is paid (25% assumed) brings it to 4.2. |
| Tax dispute, 9.0 | Claim, if lost. 1.5 is already deposited. On an assumed 40% chance of losing, the expected cost, net of the deposit, is 2.1. |
| Capex backlog, 12.0 | Claim. Overdue relining and press replacement. Of it, 8.0 is catch-up that EBITDA has been flattered by not spending; 4.0 is betterment the buyer would choose. Deduct 8.0. |
| Surplus land, 30.0 | Separable. After an assumed 15% for tax and selling costs, and two years to sell at 10%, it is worth 21.1 today. |
On an EBITDA of ₹58.0 crore after rent and without the treasury income, at the same 7.5 times, enterprise value is ₹435.0 crore. The bridge then runs: 435.0, less 118.0, plus 36.0 for investments and free cash, less 15.0, 6.9, 4.2, 2.1 and 8.0, plus 21.1. Equity value is ₹337.9 crore. Each line is rounded to one decimal before adding, so the parts sum to the total as printed.
The tax dispute deserves a second look. Accounting standards on contingent liabilities (AS 29 for companies on the older standards; IAS 37 and Ind AS 37 elsewhere) keep an outflow that is possible but not probable out of the balance sheet and mention it in a note. A buyer is not bound by that. The balance sheet answers a reporting question; the bridge answers "what will this cost me to own?". The backlog is the easiest line to dispute honestly, because it is the gap between two engineers' views of the same kiln.
Three drafts of one bridge
Figure 1 sets the three bridges side by side. Chirag's draft keeps the treasury income in EBITDA and also adds the investments, counts all the cash, treats his loan as his own money, and leaves out the debt-like items and the backlog. Ardhan's draft strips the income, counts only free cash, deducts a lease liability that rent has already covered, takes every disputed amount at face value and gives nothing for land it will not use. Chirag's differs from the consistent reading on eight lines; Ardhan's on six.
Figure 1 · Illustration with invented data
Nine places where the drafts part company
View as a table
| Line (₹ crore) | Chirag’s draft | Consistent reading | Ardhan’s draft |
|---|---|---|---|
| Income in the multiple | +18.0 | 0.0 | 0.0 |
| Cash counted | +14.0 | +4.0 | +4.0 |
| Lease liability | 0.0 | 0.0 | −26.1 |
| Promoter loan | 0.0 | −15.0 | −15.0 |
| Deferred consideration | 0.0 | −6.9 | −8.0 |
| Unfunded gratuity | 0.0 | −4.2 | −5.6 |
| Tax dispute | 0.0 | −2.1 | −7.5 |
| Capex backlog | 0.0 | −8.0 | −12.0 |
| Surplus land | +30.0 | +21.1 | 0.0 |
| Enterprise value | 453.0 | 435.0 | 435.0 |
| Equity value | 411.0 | 337.9 | 278.8 |
Chirag's bridge ends at ₹411.0 crore and Ardhan's at ₹278.8 crore. Seller's draft minus buyer's draft is ₹132.2 crore. The consistent reading, ₹337.9 crore, is ₹73.1 crore below Chirag and ₹59.1 crore above Ardhan, though not in the middle of every line.
Four piles in the gap
The ₹132.2 crore is not one disagreement. Sorted by what it would take to settle each part, it falls into four. The sorting is this article's own classification, and the first pile in particular depends on how its problem is cured.
Figure 2 · Illustration with invented data
What it would take to close each part of the gap
View as a table
| Pile | ₹ crore | Made of |
|---|---|---|
| Inconsistency | 44.1 | Treasury income 18.0 + lease liability 26.1 |
| Structure | 15.0 | Promoter loan 15.0 |
| Documents | 23.6 | Cash 10.0 + deferred consideration 8.0 + gratuity 5.6 |
| Judgement | 49.5 | Land 30.0 + backlog 12.0 + tax dispute 7.5 |
| Total | 132.2 | Chirag’s equity value less Ardhan’s |
The first pile, ₹44.1 crore, is inconsistency. Chirag's draft multiplies earnings that include treasury income and also adds the investments that earn it; Ardhan's opening offer made the same multiplication, and only its later draft strips the income. Ardhan's draft, for its part, charges Bhuvan's rent in EBITDA and deducts the lease as well. These are the same inconsistency seen from opposite sides, and neither needs a negotiator, only a rule that a claim sits in the earnings or in the bridge, never in both. The second, ₹15.0 crore, is structure: the promoter loan is a claim whichever of them is right, and the only question is whether it is repaid or waived. The third, ₹23.6 crore, is documentary: how much cash is restricted, what is owed on the glaze line, what the actuary says. A folder settles it, apart from the ₹6.0 crore operating-cash float, which is a judgement. Only the fourth, ₹49.5 crore, is judgement proper: the land (30.0 against nothing), the backlog (12.0 against nothing) and the tax dispute (7.5 against nothing).
The piles describe the gap between two drafts that begin at opposite extremes; in a real negotiation the extremes would be closer and the piles would shift. What survives is the order of work. Settle the inconsistency first, because no one can defend it, then the structure, then the documents. After the first two, ₹73.1 crore is left in dispute; after the third, ₹49.5 crore, and that is where the negotiating hours belong.
Cash in the multiple and in the bridge. Management accounts may put interest and fund gains into "other income" and then into EBITDA. Multiplied by 7.5, Bhuvan's ₹2.4 crore of treasury income contributes ₹18.0 crore to enterprise value; if the ₹32.0 crore of investments are then added in the bridge as well, that ₹18.0 crore is counted twice. The cure shapes the pile. Strip the income and keep the investments, and the item is ₹18.0 crore. Keep the income and drop the investments, and the seller loses ₹14.0 crore instead, because a 7.5% yield capitalised at 7.5 times is worth 56 paise in the rupee. The fix does not always favour the buyer.
Rent and the lease. Under Ind AS 116, the Indian counterpart of IFRS 16, a lessee shows a lease liability and depreciation plus interest in place of rent, so its EBITDA is higher by the rent. How peers drift between those footings is the subject of the article on industry multiples; for the bridge only one point matters, which is that the multiple and the bridge must sit on the same footing. Bhuvan's 7.5 times on ₹58.0 crore after rent gives ₹435.0 crore. Treat the ₹26.1 crore lease liability as a claim instead, and the same price is ₹461.1 crore on the ₹64.0 crore before-rent EBITDA, a multiple of 7.2 times. Apply 7.5 times to the ₹64.0 crore and deduct the lease, and equity rises by ₹18.9 crore with no change in the business.
Calculator
Build your own bridge, line by line
The defaults are Bhuvan Vitrified’s consistent reading from this article. Amounts are in ₹ crore. Choose how each line is treated, or press one of the three drafts, and the page will say when something is counted twice or dropped. Replace the figures with your own company’s; it is a classification aid, not a valuation.
Result
- Enterprise value
- ₹435.0 crore
- Equity value
- ₹337.9 crore
- Net bridge items
- −97.1
| Line | ₹ crore | Treatment |
|---|---|---|
| Bank borrowings | −118.0 | deducted |
| Cash and bank | +4.0 | free cash only |
| Liquid investments | +32.0 | added |
| Lease liability | 0.0 | left out |
| Promoter loan | −15.0 | deducted (repaid) |
| Deferred consideration | −6.9 | present value |
| Unfunded gratuity | −4.2 | after tax |
| Tax dispute | −2.1 | weighted by chance, net of deposit |
| Capex backlog | −8.0 | catch-up only |
| Surplus land | +21.1 | net of leakage, discounted |
No line is counted twice or dropped on these choices.
Each line is rounded to ₹0.1 crore before adding. Loss of value to tax on the price, deal costs and the other items listed in the technical notes are not modelled.
Between the date of the accounts and the day the cheque clears
A bridge is struck at a date, and companies change between that date and the day the shares move. In a completion-accounts deal the price is recomputed on the completion date: enterprise value, less the net debt then, adjusted for how far working capital (stock and receivables, less payables) stands above or below an agreed "normal" level called the peg. In a locked-box deal the price is fixed from an earlier balance sheet, and the buyer is protected by a promise that no value will leak to the seller in between: no dividends, no extra pay, no payments to related parties other than those listed as permitted. A seller may ask for a ticking fee, an interest-like addition to the price, for the months in which the buyer owns the economics of a business it has not yet paid for. Both are contractual conventions, not rules of law, and the share purchase agreement fixes the mechanics.
Take the consistent reading, ₹337.9 crore at 31 March, and a completion on 30 June. Working capital is ₹80.0 crore at March, because dealers pay up before the year-end, ₹90.0 crore by June as tiles are stocked ahead of the monsoon, and ₹84.0 crore on a twelve-month average. In the quarter the business generates ₹7.0 crore of cash before working capital, so net debt rises by ₹3.0 crore.
| Mechanism | Equity price (₹ crore) | What fixes it, and who carries what |
|---|---|---|
| Locked box at 31 March | 337.9 | Fixed from March accounts. Buyer carries the quarter's movement and relies on the leakage promise. |
| Locked box with ticking fee | 344.7 | As above, plus 8% a year (assumed) on 337.9 for a quarter, 6.8. |
| Completion accounts, peg 84.0 | 340.9 | Net debt up 3.0, working capital 6.0 above the twelve-month average. |
| Completion accounts, peg 80.0 | 344.9 | The same, but the peg is March's flattered 80.0, so working capital counts 10.0 above it. |
The spread is ₹7.0 crore, a little over 2% of the equity value, and the date and the peg produce all of it. A peg set at the March figure hands the seller ₹4.0 crore that an average-based peg does not, and a locked box struck on year-end accounts of a seasonal business inherits the same flattery in its net debt. A twelve-month average is the safer base for the peg. Not modelled: tax on the price, warranty and indemnity insurance, interest on working-capital funding, and seasonality in anything but working capital.
What reaches the owner
Equity value is the value of every share. Chirag holds all of them, but the cheque for the shares is not all he receives, because the same bridge is also a list of his other positions. He is owed ₹15.0 crore as a lender, and he may own the land if the deal is structured around it.
| Structure | Cheque for shares | Loan repaid | Land kept (net) | Total |
|---|---|---|---|---|
| Loan repaid, land sold with the company | 337.9 | 15.0 | none | 352.9 |
| Loan waived, land sold with the company | 352.9 | none | none | 352.9 |
| Loan repaid, land left with Chirag | 316.8 | 15.0 | 21.1 | 352.9 |
The cheque varies by ₹36.1 crore across the three rows. His total does not, because each deduction on one side shows up on the other. Whether to repay the loan or waive it, and whether to keep the land outside, are decisions about tax, stamp duty and the buyer's appetite for the land, none of which is modelled here. An equity value is correct only for the claims it has put on the page. A convertible preference share, an employee option plan or a part-owned subsidiary would each change what is left for ordinary shares, and none is in Bhuvan, nor are the refundable deposits that a dealer-based manufacturer may hold, which would be one more debt-like item. Where a family holds less than all the shares, the article on part-holdings explains why a share of this ₹337.9 crore is not simply a proportion of it.
Price it, or indemnify it
For a line nobody can settle, the deal documents offer two instruments. A price cut takes the expected cost off the cheque on completion: for the tax case, ₹2.1 crore, whatever the appeal brings. An indemnity, a promise to repay a specific loss if it arrives, pays ₹7.5 crore, the demand less the deposit, only if the appeal is lost; the agreement must say who keeps the deposit if it is won. At Chirag's assumed 40% chance of losing, the two cost him the same, provided he keeps the deposit on a win. At 10% the indemnity is far cheaper to him, and at 70% the price cut is.
So the choice turns on who knows more. A seller who knows his file, as Chirag does the tax appeal, loses nothing by giving an indemnity if he is right, and the buyer is covered if he is wrong. Where neither can check the number, as with the kiln lining, a price cut ends the argument at once. Either way, one sentence belongs in the agreement before any multiple is applied: the definition of net debt, naming each of the ten lines as in or out, and the EBITDA footing it was built on. A price that cannot be written down that way is not yet agreed, whatever the headline says.
Talking it through
If a valuation question is in front of you, a conversation about purpose, scope and the information needed is usually the right first step.
Technical notes
- All amounts are in ₹ crore unless stated, and every fact about Bhuvan Vitrified is invented. Revenue ₹420 crore, EBITDA after rent ₹58.0 crore (13.8%), rent ₹6.0 crore, treasury income ₹2.4 crore, borrowings ₹118.0 crore, cash and bank ₹14.0 crore, liquid investments ₹32.0 crore and the other bridge items are assumed for illustration. The multiple of 7.5 times is the story's, not a market observation. The 10% used to bring future amounts to today, the 25% tax rate, the 40% chance of losing the tax appeal, the 15% allowance for tax and selling costs on the land, two years to sell it, and the split of the capex backlog into 8.0 of catch-up and 4.0 of betterment are all assumptions.
- Method: enterprise value is the multiple times EBITDA on the stated footing. The equity value is the enterprise value plus or minus the bridge lines. Lease liability: six annual payments of 6.0 discounted at 10%, 26.1. Deferred consideration: 8.0 payable half after one year and half after two, present value 6.9 (the calculator uses a single 1.5-year wait, which rounds to the same figure). Gratuity: obligation 9.2 less fund assets 3.6, unfunded 5.6, 4.2 after the assumed 25% tax saving. Tax dispute: 40% × 9.0 demand less 1.5 deposit, 2.1 (equal to 40% × 7.5 less 60% × 1.5). Land: 30.0 less 15%, discounted two years at 10%, 21.1. Lease footing: 7.5 times on before-rent EBITDA of 64.0 gives 480.0; deducting the 26.1 lease liability leaves 453.9, which is 18.9 above the 435.0 on the after-rent footing.
- Rounding: each bridge line is rounded to ₹0.1 crore before adding, so printed lines add to the printed totals. Consistent reading: 435.0 − 118.0 + 36.0 (investments 32.0 and free cash 4.0) − 15.0 − 6.9 − 4.2 − 2.1 − 8.0 + 21.1 = 337.9. Chirag's draft: 453.0 − 118.0 + 14.0 + 32.0 + 30.0 = 411.0. Ardhan's draft: 435.0 − 118.0 + 4.0 + 32.0 − 26.1 − 15.0 − 8.0 − 5.6 − 7.5 − 12.0 = 278.8. The gap of 132.2 is the sum of the line differences, 18.0 + 10.0 + 26.1 + 15.0 + 8.0 + 5.6 + 7.5 + 12.0 + 30.0.
- The four piles describe the gap between two deliberately extreme drafts. They are not a general ranking of how much each kind of item matters, and the consistent reading is one defensible position, not the only one.
- Accounting footing: Bhuvan is assumed to report under the older Indian accounting standards, so rent is charged above EBITDA; this is an assumption of the story and no net-worth threshold is claimed. A company applying Ind AS 116 would show EBITDA higher by the rent and a lease liability on its balance sheet. The Ind AS texts (116 and 37) could not be retrieved from the Ministry of Corporate Affairs site (access refused), so those statements rest on the IFRS Foundation's published descriptions of IFRS 16 and IAS 37, which they follow, and the reference to AS 29 for companies on the older standards is stated from general knowledge, not from the text.
- Timing example: locked-box date 31 March, completion 30 June, working capital ₹80.0 crore at March, ₹90.0 crore at June and ₹84.0 crore on a twelve-month average, cash before working capital ₹7.0 crore in the quarter (net debt up 3.0), ticking fee at an assumed 8% a year (6.8 for a quarter). Not modelled: tax on the price or on the land gain beyond the flat 15%, stamp duty, warranty and indemnity insurance, interest on working-capital funding, refundable dealer deposits, convertible preference shares, employee options, any minority holding, deal costs, and seasonality in anything but working capital.
- This is an educational model, not a valuation report and not advice on any transaction.
References
Checked on 7 November 2026. Cited in general terms only.
- International Valuation Standards Council, International Valuation Standards, effective 31 January 2025: IVS 200 Businesses and Business Interests, paragraph 20.07 (the business or interest valued, including enterprise value and equity value, must be specified and defined), paragraph 60.04 (enterprise value from cash flows before debt servicing, equity value from cash flows after it) and paragraphs 120.02 and 120.03 (operating and non-operating assets; the idle-plant example). www.ivsc.org
- IFRS Foundation, IFRS 16 Leases, standard page: a lessee recognises a right-of-use asset and a lease liability for leases of more than 12 months unless the asset is of low value. The corresponding Indian standard is Ind AS 116; the Ministry of Corporate Affairs text was not retrievable. A lessee's depreciation and interest replacing rent follows from the standard's single lessee model but is not quoted on the page. www.ifrs.org
- IFRS Foundation, IAS 37 Provisions, Contingent Liabilities and Contingent Assets, standard page: a provision is recognised where an outflow is probable; a contingent liability is not recognised in the statement of financial position and is disclosed unless the possibility of an outflow is remote. The corresponding Indian standards are Ind AS 37 and, for companies on the older standards, AS 29; neither text was retrievable from the Ministry of Corporate Affairs. www.ifrs.org
- Lewis Silkin LLP, 'US/UK M&A price adjustment mechanisms: the locked box' (4 April 2024): a secondary, practitioner description of locked-box pricing, leakage, permitted leakage and ticking fees. It describes English-law practice and is cited only for what the terms mean. www.lewissilkin.com
About this article
This article and its illustrations are for general education. They are not a valuation, a valuation report under any law, or advice on any transaction, tax or regulatory matter.
A valuation for a real decision depends on the facts, the purpose, the date, the applicable law and standards, and the information available. Please seek professional advice before relying on any figure.
The kilns, the land and the people walking past them are drawn for this page. The 7.5 times is the story's own multiple and says nothing about what tile makers sell for.